Case Study · Mining

Mining Equipment Integrator: From a 20-Set Pilot to a 1,000-Set Roadmap

An Australian mining-equipment integrator needed a partner for low-volume starts that could scale fast over three years.

Australia2025–2026
20 sets initial
4-week lead time
Forecast 50 → 500 → 1,000 sets (2026–2027)

The Challenge

The client needed initial low-volume prototype runs plus a credible path to high volume, while competing against an established vendor base.

Our Solution

We quoted the initial low-volume order competitively with a 4-week lead time, demonstrated low-volume flexibility, and laid out capacity planning for the volume ramp.

The Result

Entered the vendor shortlist; the client opened parallel inquiries for additional projects and planned a factory audit to finalize a long-term partnership.