Background
An Australian mining equipment integrator sought a supplier for custom low-to-moderate volume wiring harnesses, with significant volume scaling projected over a three-year horizon.
The Challenge
The client needed a supplier that could handle initial low-volume prototype runs while supporting a rapid scale-up to high volumes. We had to prove this capability while competing against their established vendor base.
Our Solution
We provided a competitive quotation for the initial 20-set order with a 4-week lead time, demonstrating manufacturing flexibility for low-volume starts. Alongside the quote, we outlined capacity planning for the forecast ramp to 1,000 sets by 2027.
The Result
We entered the vendor evaluation shortlist. The client opened parallel inquiries for additional projects and began planning a factory audit to finalize a long-term partnership.
Program Specifications
| Initial Order | 20 sets |
|---|---|
| Lead Time | 4 weeks |
| Volume Forecast | 50 (2026) to 1,000 sets (2027) |