Case Study · Mining

Mining Equipment: Low-Volume Start Wins Shortlist Spot With Path to 1,000 Sets

An Australian mining equipment integrator sought a supplier for low-to-moderate volume harnesses with a forecast of major volume scaling over three years.

Australia2025
20 sets initial order
4-week lead time
Forecast 50 sets in 2026
Forecast 1,000 sets by 2027
Program specifications
Initial Order20 sets
Lead Time4 weeks
Volume Forecast50 (2026) to 1,000 sets (2027)

Background

An Australian mining equipment integrator sought a supplier for custom low-to-moderate volume wiring harnesses, with significant volume scaling projected over a three-year horizon.

The Challenge

The client needed a supplier that could handle initial low-volume prototype runs while supporting a rapid scale-up to high volumes. We had to prove this capability while competing against their established vendor base.

Our Solution

We provided a competitive quotation for the initial 20-set order with a 4-week lead time, demonstrating manufacturing flexibility for low-volume starts. Alongside the quote, we outlined capacity planning for the forecast ramp to 1,000 sets by 2027.

The Result

We entered the vendor evaluation shortlist. The client opened parallel inquiries for additional projects and began planning a factory audit to finalize a long-term partnership.