Case Study · Currency Technology

Currency Technology OEM: Prototype-to-Mass Transition Secures Multi-Year 5-10K Unit Program

Flexible sample builds followed by a structured 500-set MOQ line carried the program from prototype to mass production and a multi-year repeat order.

India · 2020

Sample qty 10-20 pcs

MOQ 500 sets

Annual volume 5-10K units

2-3 week lead time

Background

An Indian subsidiary of a global currency-technology OEM required custom cable assemblies for banknote-processing R&D, starting with small prototype batches and scaling to mass production.

The Challenge

We had to manage the transition from 10-20 piece sample orders to a 500-unit MOQ mass production. Throughout, the customer expected consistent quality and aggressive 2-3 week lead times.

Our Solution

We provided flexible sample manufacturing through streamlined payment channels for fast procurement, then set up structured mass production at a 500-set MOQ. The line was configured to accommodate annual volumes of 5,000 to 10,000 units.

The Result

We transitioned the program from prototype to mass production and secured a multi-year repeat program. Annual volumes reached 5,000 to 10,000 units.

Program Specifications

Sample Quantity10-20 pieces
MOQ500 sets
Annual Volume5,000-10,000 units
Lead Time2-3 weeks