Case Study · Industrial

Industrial Equipment: UL-Certified Harness Revised Mid-Production With No Lead-Time Penalty

An industrial equipment integrator needed a mid-production harness design revision while enforcing UL certification for their end market.

South Africa2022Industrial harnesses
UL certification met
V2.0 to V2.1 mid-production revision
No lead-time penalty
Custom label and end-treatment specs
Program specifications
CertificationUL-certified wire and components
RevisionV2.0 to V2.1 transition
CustomizationCustom label and end-treatment

Background

An industrial equipment integrator needed to update their wire harness design from V2.0 to V2.1 while simultaneously enforcing strict safety certifications for their end market.

The Challenge

The customer required a mid-production design iteration, moving from V2.0 to V2.1, and mandated UL certification for the harnesses. This demanded strict material compliance and documentation without disrupting an urgent delivery schedule.

Our Solution

Our engineering teams coordinated closely on the V2.1 drawing updates, confirming label content and end-treatment specifications. We sourced and verified UL-certified wire and components to meet the safety standards set by the customer's electronic engineering team.

The Result

We transitioned production to the V2.1 specification with no lead-time penalty. The delivered harnesses were fully UL-certified and met the customer's rigorous safety and quality standards.