Case Study · Energy Storage

Energy Storage SME: 100 Custom 2-Pin Battery Assemblies Delivered in 12 Days

A German energy storage SME needed urgent prototype samples for a new 2-pin battery connector assembly to hit an aggressive project milestone.

100 units in 12 days
12-day lead time
2-pin custom assembly
On-time project validation
Program specifications
Configuration2-pin custom battery assembly
Quantity100 pieces
Lead Time12 days

Background

A German energy storage SME needed urgent prototype samples for a new 2-pin battery connector assembly to meet an aggressive project milestone.

The Challenge

The customer required a very short lead time of just 12 days for delivery of 100 custom assemblies. Missing the window would jeopardize a critical project deadline.

Our Solution

We expedited the manufacturing and logistics process to prioritize the custom 2-pin assembly run. The prototype batch was produced and shipped inside the tight window.

The Result

We delivered the 100-piece prototype batch within the 12-day deadline. This kept the customer on schedule to proceed with their project validation.