Case Study · Automotive

EV Automotive OEM: 50-Unit NPI Prototype Delivered in 15 Days

Fast-tracked scheduling and authorized Amphenol connector sourcing shipped all 50 prototype units on time, earning a follow-on multi-PO repeat program.

United States · 2025 · Automotive harnesses

50 units in 15 days

Authorized Amphenol connectors

Follow-on multi-PO repeat program

Background

An electric-vehicle OEM in the United States was launching a new vehicle platform and required a fast new-product-introduction prototype build to validate its harness package.

The Challenge

The customer needed 50 prototype units delivered within 15 days of PO issuance. Meeting that window required rapid procurement of authorized Amphenol connectors alongside expedited manufacturing, leaving no slack for sourcing or scheduling delays.

Our Solution

We fast-tracked the production schedule and secured authorized Amphenol connector procurement to guarantee genuine components. Expedited logistics were coordinated end to end so the build could ship inside the stringent deadline.

The Result

The initial prototype batch shipped on time, all 50 units inside the 15-day window. The on-time delivery earned the customer's trust and led to a follow-on multi-PO repeat program for the vehicle platform.

Program Specifications

Volume50 prototype units
Lead Time15 days from PO
ConnectorsAmphenol (authorized)